Lund, Sweden · Upper secondary school
Twelve steel stairs for a school that never stops moving
Twelve steel stairs, about 67 tonnes of structural steel, for the Hedda Andersson upper secondary school in Lund, Sweden: closed straight stairs and spiral stairs, lifted, aligned and welded on site.
Project facts
- Location
- Lund, Sweden
- Building
- Upper secondary school
- Stairs
- 12 steel stairs, straight and spiral
- Steel
- About 67 tonnes
- Balustrade
- 8 mm flat steel, prepared for wood cladding
- Our scope
- Engineering, fabrication and installation of the steel structure
- Built
- 2021–2022
The challenge
Public buildings need stairs that look light and carry heavy daily use. Here the stairs run through the building up to the 13th floor, prepared for wood cladding, insulation and poured concrete steps.
Our solution
That balance is engineering, not decoration: welded steel structures with 8 mm flat steel balustrades ready for wood cladding, delivered from Riga and installed by our own crew. The spiral stairs in the atrium were then painted and clad in vertical oak slats. The oak cladding was supplied and fitted by others – everything in steel we engineered, fabricated, delivered and installed ourselves.