A chain of helical steel stairs rising floor by floor through the atrium of Sjustjärnan, E.ON’s Nordic headquarters in Malmö: 2.5 m wide flights, closed box balustrades and a recessed handrail, developed together with the architects from the first sketches.
Project facts
- Location
- Malmö, Sweden
- Building
- Sjustjärnan – E.ON Nordic headquarters
- Architect
- Kanozi Arkitekter
- Stairs
- Helical steel stairs from the 2nd floor to the top of the atrium
- Flight width
- 2.5 m
- Balustrade
- 126 mm closed steel box, prepared for timber cladding
- Handrail
- Ø 32 mm steel, set into a channel in the balustrade
- Soffit
- 2 mm steel sheet, filled and painted
- Our scope
- Design development with the architects, engineering, fabrication, delivery and installation
- Built
- 2019–2022
The challenge
Kanozi Arkitekter wanted the stairs to be the heart of the building – one continuous sculptural ribbon from the 2nd floor to the top of the atrium, wide enough to meet on, with smooth closed balustrades and no visible structure. They brought us in in 2019, long before production, to turn the idea into something that could be built.
Our solution
We worked alongside the architects with hand sketches and 3D models and reworked the geometry several times until every proportion was right – which left them free to concentrate on the design. Then we fabricated the stairs in Riga: 8 mm steel stringers, steel tread and riser bases prepared for oak, 126 mm box balustrades with a channel for the Ø 32 mm handrail, and a 2 mm steel sheet soffit. On site our own crew lifted, aligned and welded the sections, then filled and sanded every surface for paint. Between our first estimate in 2019 and the steel order, steel prices more than tripled; together with the main contractor Skanska this was settled quickly and the work never stopped.
How it was built
01
Raw steel
The stairs were welded in sections in Riga, lifted into the atrium and welded into one structure on site.

02
Soffit
The underside is closed with 2 mm steel sheet that follows the helix without a break.

03
Filling and sanding
Every weld was ground flush, then all surfaces were filled and sanded. The turquoise is the colour of the filler, not the final paint.

04
Paint and handrail
Last came the white paint and the dark handrail set into its channel.