Stairs / Projects / Law library, Gothenburg

Gothenburg, Sweden · Law firm office and library

A teal steel ribbon through a law library

A free-standing curved steel stair between two floors of a law firm's library in Gothenburg: closed teal balustrades without a visible joint, Douglas fir treads and risers, and a handrail set into the balustrade.

Teal curved staircase sweeping down into a law library with red armchairs, Gothenburg

Project facts

Location
Gothenburg, Sweden
Building
Law firm office and library
Stair
Free-standing curved steel stair between two floors
Balustrade
Closed box balustrades, steel sheet on a 25 × 25 mm tube frame
Treads
Douglas fir treads and risers on steel bases
Handrail
Ø 40 mm, recessed into the balustrade
Finish
Welds ground flush, filled, sanded and painted on site
Our scope
Engineering, fabrication and installation
Built
2011

The challenge

The stair had to read as one seamless ribbon of colour – no visible joints, bolts or brackets – sweeping through a floor opening in a working office, with the same teal band continuing around the edge of the opening.

Our solution

We modelled the stair in 3D, welded the steel structure in sections in our workshop in Riga and assembled it there to check the geometry. On site the sections were lifted in, aligned and welded into one piece. Every weld was ground flush, the surfaces were filled, sanded and painted in place. The balustrades are closed boxes – steel sheet on a square-tube frame – with a Ø 40 mm handrail set into a recess, and Douglas fir treads and risers on steel bases. A matching teal slab cover runs around the floor opening.

How it was built

01

3D model

Every plate was modelled in 3D before any steel was cut – the stair, the balustrade boxes and the edge of the floor opening.

3D model of the curved stair in the floor opening, seen from above3D model of the stair seen from the front

02

Workshop

The structure was welded in sections in Riga and assembled in the workshop to check the geometry before shipping.

Steel stair sections assembled in the workshop

03

Installation

On site the sections were lifted into the opening, aligned and welded into one continuous structure.

Steel stair section being lifted into the floor openingRaw steel stair standing in place on siteRaw steel treads and balustrades seen from aboveWelder joining the balustrade sections on site

04

Finishing

Welds ground flush, surfaces filled, sanded and primed, then painted in place. The Douglas fir treads went on last.

Sanding the filled underside of the stairPrimed underside of the stair, ready for paintPainted teal stair with protected timber treads, seen from abovePainted stair in the empty room before the library was fitted out

Gallery